Work on Musi River Rejuvenation to begin in January next year

Digital Desk |

Hyderabad, Nov 25 (IANS) Work on the Musi River Rejuvenation project will commence in January next year, officials said.

Chief Minister A. Revanth Reddy was informed by the officials that preparations are underway to commence Phase-1 works in January 2027, and the tendering process has already begun.

Rejuvenation of the Musi River, which flows through Hyderabad, is the brainchild of the Chief Minister, who believes the project would not only address frequent flooding but also elevate Hyderabad into the league of global cities thriving on riverfront economies.

The Musi riverfront is planned to be developed with cultural venues, recreational zones and public promenades. At a meeting late on Tuesday, the Chief Minister reviewed the progress of the various development projects taken up by the state Municipal Administration and Urban Development Department.

He sought updates on the progress of the Musi River Rejuvenation project and the development of radial roads.

The officials briefed the CM that, under Phase-1 of the Musi River Rejuvenation project, the 9.20 km stretch from Himayat Sagar to Gandhi Sarovar has been designated as ‘Zone-1A,’ and the 11.8 km stretch from Osman Sagar to Gandhi Sarovar as ‘Zone-1B.’

CM Revanth Reddy inquired about the progress of the development works at Mir Alam Tank. Officials said the project would be completed by January 2028. The development of Mir Alam Tank, which includes removing the silt that has accumulated in the lake for a long time, was discussed in the meeting.

Officials also updated the Chief Minister on the progress of radial road construction and land acquisition. The CM instructed the authorities to further accelerate the construction works of the radial roads.

CM Revanth Reddy reviewed the progress of the modern Goshala (cow shelter), currently under construction at Gandipet, and the deadline to complete the works by March 2027.

During the meeting, officials informed the Chief Minister on the techno-economic feasibility of Phase-1 of the Personal Rapid Transit System (PRTS) in Hyderabad and the viability of an alignment stretching from Kukatpally through Raidurg to Biodiversity.

The MA and UD Officials presented proposals for an alignment running from the Begumpet Metro Station, passing through the Secretariat and Basheerbagh, and extending to Ranigunj.

The Chief Minister suggested identifying suitable locations for PRTS depots, specifically around Necklace Road, Raidurg, and People’s Plaza, and conducting a feasibility study for these sites.

The CM further instructed that preliminary plans be developed to incorporate multi-level parking facilities in the vicinity of the depots. Comprehensive plans should be finalized only after a thorough study of the routes, depot construction, and other related aspects.

Be the first to comment

Leave a Reply

Your email address will not be published.


*